Repairs to Calverley River Bridge to continue into 2028
November 20, 2026Leeds City Council has begun a major repair programme on Calverley River Bridge, which carries about 34,000 vehicles a day on the A6120 Outer Ring Road between Horsforth and Rodley.
Engineers identified more than 1,000 small areas needing concrete repairs during inspections. The work is intended to address deterioration in the bridge’s concrete and steel reinforcement and extend its operational life. The council says the bridge remains safe to use while repairs are carried out.
The works began earlier this year and are expected to continue into 2028. The bridge will remain open to two-way traffic, and the council does not expect significant delays.
Temporary pedestrian crossings
Temporary crossings are due to be installed between December and January for five weeks, while sections of repair scaffold are put up above the footways. One footway will be closed at a time, with pedestrians directed to the other side using push-button crossings.
The council says specialist concrete repair equipment is being used to reduce vibration exposure for workers and help carry out the repairs more efficiently.
Councillor Tom Hinchcliffe, the council’s executive member for transport and planning, said: “Calverley River Bridge is a vital part of Leeds’ highway network, carrying thousands of journeys every day and connecting communities across the city.
“While much of this work is taking place out of sight beneath the bridge, it is an important investment in maintaining and improving our infrastructure.
“By carrying out these repairs now, we can extend the life of the bridge, maintain this important route and help avoid more significant disruption in future.
“We appreciate the patience of residents, pedestrians and road users while these works continue and while the temporary crossings are in place.”


